Today's Message Index:
----------------------
1. 04:59 PM - Mod 78 News (djaflyact)
Message 1
INDEX | Back to Main INDEX |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
I have the airplane with the spar bushings curing at this very moment. This should
be the last big step before returning the airplane to airplane status. A few
things:
Replacing the bolts on the CS08 brackets with flush structural screws did the trick.
Both spars now fit and there is no interference with the CS08 brackets rotating
back and forth. I think the extra clearance with the flush screws is necessary.
It buys margin anyway.
I will attach pictures of the last day. Once the Araldite is packed in with the
bushings, the surrounding area is released with grease and packing tape. There
is no chance of gluing the wings in place.
To get a good temperature, I am using a heater in the cabin and have a tent underneath
the airplane with a 100 watt bulb warming. The temp at the spar pins is
about 75 to 80F. I can't tell what is happening inside the tunnel, but I'm sure
it will be good enough.
To fly now, the controls need to be reinstalled and then starts the test flights.
Gotta repack that chute first.
I don't know if there are any retrofitting builders out there, but I would love
to have this information if I were. It is a relief and about a 3 month mod at
this point. Almost there.
Dave
A227
Mini U2
Read this topic online here:
http://forums.matronics.com/viewtopic.php?p=415940#415940
Attachments:
http://forums.matronics.com//files/curing_451.jpg
http://forums.matronics.com//files/greased_and_glued_117.jpg
http://forums.matronics.com//files/ready_658.jpg
Other Matronics Email List Services
These Email List Services are sponsored solely by Matronics and through the generous Contributions of its members.
-- Please support this service by making your Contribution today! --
|