Today's Message Index:
----------------------
1. 11:36 AM - Re: RV7-List: -7 tipup F-721A: When?? (Charlie England)
Message 1
INDEX | Back to Main INDEX |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: RV7-List: -7 tipup F-721A: When?? |
Charlie England wrote:
> --> RV7-List message posted by: Charlie England <ceengland@bellsouth.net>
>
> Those who have gone before,
>
> When is it ok to rivet the F-721A's ('forward canopy deck', @
> instrument panel) to the longerons? I've fit all the stuff related to
> the F-768 sub panel components but I'm waiting (as the instructions
> say you can) to rivet that assembly into the fuselage. I'm ready to
> start fitting the canopy frame, but that ain't happening unless I
> either rivet the F-721A's to the longerons or take them out completely.
>
> The earlier instructions describe 'fitting' them, but don't specify
> actually riveting them in place.
> Thanks,
>
> Charlie
OK, I know that Van's engineers won't apologize for the terrible
nomenclature, so I will. I'm sorry that Van named 2 little 4" x 12"
triangles 'forward canopy decks'.
These are the pieces that rivet to the top of the top longerons from
about 2" aft of the instrument panel, where they are only an inch wide,
up to the 'sub panel' where they are about 4 " wide.
I have no intention of riveting the upper structure & forward skin yet.
But, clecos holding these F-721A's on the longerons interfere with
fitting the canopy frame. I'm trying to determine whether I'm supposed
to go ahead with riveting these 2 small pieces so I can fit the canopy,
& not interfere with anything else in the process.
Thanks,
Charlie
Other Matronics Email List Services
These Email List Services are sponsored solely by Matronics and through the generous Contributions of its members.
-- Please support this service by making your Contribution today! --
|