In general the philosphy I use is don't cut or rivet unless you absolutely
cannot go any further without it.
In this case could you use -6 screws and nuts temporarily.
W
OK, I know that Van's engineers won't apologize for the terrible
nomenclature, so I will. I'm sorry that Van named 2 little 4" x 12"
triangles 'forward canopy decks'.
These are the pieces that rivet to the top of the top longerons from about 2"
aft of the instrument panel, where they are only an inch wide, up to the 'sub
panel' where they are about 4 " wide.
I have no intention of riveting the upper structure & forward skin yet.
But, clecos holding these F-721A's on the longerons interfere with fitting
the canopy frame. I'm trying to determine whether I'm supposed to go ahead
with riveting these 2 small pieces so I can fit the canopy, & not interfere
with anything else in the process.
Thanks,
Charlie
Message 2
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: To rivet or not |
Charlie
Wheeler's advice below is about the best you'll get. I've found #4 screws work
great to temporarily hold in place of 3/32" rivets. Sometimes, clecos just won't
do the job. I much prefer to keep everything temporarily fastened until I'm
ready to pull an assembly apart to dimple, countersink, deburr, Alodine and
prime it. Then it goes back together for riveting. You will save a lot of time
if you can do fewer "large" assemblies, as opposed to more "small" sub-assemblies.
Charlie Kuss
--- On Wed, 6/18/08, Wheeler North <wnorth@sdccd.edu> wrote:
> From: Wheeler North <wnorth@sdccd.edu>
> Subject: RV-List: To rivet or not
> To: rv-list@matronics.com
> Date: Wednesday, June 18, 2008, 11:29 AM
> <wnorth@sdccd.edu>
>
> In general the philosphy I use is don't cut or rivet
> unless you absolutely
> cannot go any further without it.
>
> In this case could you use -6 screws and nuts temporarily.
>
> W
>
>
>
> OK, I know that Van's engineers won't apologize for
> the terrible
> nomenclature, so I will. I'm sorry that Van named 2
> little 4" x 12"
> triangles 'forward canopy decks'.
>
> These are the pieces that rivet to the top of the top
> longerons from about 2"
> aft of the instrument panel, where they are only an inch
> wide, up to the 'sub
> panel' where they are about 4 " wide.
>
> I have no intention of riveting the upper structure &
> forward skin yet.
> But, clecos holding these F-721A's on the longerons
> interfere with fitting
> the canopy frame. I'm trying to determine whether
> I'm supposed to go ahead
> with riveting these 2 small pieces so I can fit the canopy,
> & not interfere
> with anything else in the process.
>
> Thanks,
>
> Charlie
>
>
>
>
>
>
Message 3
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: RV7-List: -7 tipup F-721A: When?? |
cut the guys some slack you ought to try to work from boeing drawings when
rebuilding large sections of fuselage.-and changing the main landing gear
fitting on a dc-8 went bacisally, remove all interfering structure and ins
tall per drawing xxx-xxx, reinstall disturbed structure. that was the instr
uctions for 45 days of work for four men round the clock.
rick
--- On Tue, 6/17/08, Charlie England <ceengland@bellsouth.net> wrote:
From: Charlie England <ceengland@bellsouth.net>
Subject: RV-List: Re: RV7-List: -7 tipup F-721A: When??
<ceengland@bellsouth.net>
Charlie England wrote:
> --> RV7-List message posted by: Charlie England
<ceengland@bellsouth.net>
>
> Those who have gone before,
>
> When is it ok to rivet the F-721A's ('forward canopy deck', @
> instrument panel) to the longerons? I've fit all the stuff related to
> the F-768 sub panel components but I'm waiting (as the instructions
> say you can) to rivet that assembly into the fuselage. I'm ready to
> start fitting the canopy frame, but that ain't happening unless I
> either rivet the F-721A's to the longerons or take them out
completely.
>
> The earlier instructions describe 'fitting' them, but don't
specify
> actually riveting them in place.
> Thanks,
>
> Charlie
OK, I know that Van's engineers won't apologize for the terrible
nomenclature, so I will. I'm sorry that Van named 2 little 4" x
12"
triangles 'forward canopy decks'.
These are the pieces that rivet to the top of the top longerons from
about 2" aft of the instrument panel, where they are only an inch wide,
up to the 'sub panel' where they are about 4 " wide.
I have no intention of riveting the upper structure & forward skin yet.
But, clecos holding these F-721A's on the longerons interfere with
fitting the canopy frame. I'm trying to determine whether I'm supposed
to go ahead with riveting these 2 small pieces so I can fit the canopy,
& not interfere with anything else in the process.
Thanks,
Charlie
============0A=0A=0A
Message 4
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: RV7-List: -7 tipup F-721A: When?? |
Just kidding. Sort of.
I know that we are really living in the 'best of times', but it still
gets a little frustrating occasionally. Found 2 actual errors in the
plans/instructions within minutes of each other recently. From the email
I haven't yet sent to Van's,
>
dwg 47 drawn 1/22/01 sector c/d-9 top view of fuselage canopy frame:
perspective callout (rt/aft) is rotated 90 degrees counter-clockwise
Instructions revised 6/2/04 fuselage section 8-20 under heading
'Installing the Front Deck (Tipup Canopy Only) 6th paragraph beginning
'Assemble the components...' 2nd sentence says 'Locate and drill the
hat-section F-697 Channel to the *aft face* of the F-768A Center
Subpanel.' (Drawings show the had section on the *forward* side of the
F-768A subpanel.)
>
On a positive note, I actually got a Van's employee to admit that it
would be useful to 1st time builders if the parts list was in some
(almost any) order other than the one the warehouse employee uses to
pull the parts.
Charlie
(Make no mistake, I DO love my RV.)
RICHARD MILLER wrote:
>
> cut the guys some slack you ought to try to work from boeing drawings
> when rebuilding large sections of fuselage. and changing the main
> landing gear fitting on a dc-8 went bacisally, remove all interfering
> structure and install per drawing xxx-xxx, reinstall disturbed
> structure. that was the instructions for 45 days of work for four men
> round the clock.
>
> rick
>
> --- On *Tue, 6/17/08, Charlie England /<ceengland@bellsouth.net>/* wrote:
>
> From: Charlie England <ceengland@bellsouth.net>
> Subject: RV-List: Re: RV7-List: -7 tipup F-721A: When??
> To: rv7-list@matronics.com
> Date: Tuesday, June 17, 2008, 11:28 AM
>
> <ceengland@bellsouth.net>
>
> Charlie England wrote:
> > --> RV7-List message posted by: Charlie England
> <ceengland@bellsouth.net>
> >
> > Those who have gone before,
> >
> > When is it ok to rivet the F-721A's ('forward canopy deck', @
>
> > instrument panel) to the longerons? I've fit all the stuff related to
> > the F-768 sub panel components but I'm waiting (as the instructions
> > say you can) to rivet that assembly into the fuselage. I'm ready to
> > start fitting the canopy frame, but that ain't happening unless I
> > either rivet the F-721A's to the longerons or take them out
> completely.
> >
> > The earlier instructions describe 'fitting' them, but don't
> specify
> > actually riveting them in place.
> > Thanks,
> >
> > Charlie
>
> OK, I know that Van's engineers won't apologize for the terrible
> nomenclature, so I will. I'm sorry that Van named 2 little 4" x
> 12"
> triangles 'forward canopy decks'.
>
> These are the pieces that rivet to the top of the top longerons from
> about 2" aft of the instrument panel, where they are only an inch wide,
> up to the 'sub panel' where they are about 4 " wide.
>
> I have no intention of riveting the upper structure & forward skin yet.
> But, clecos holding these F-721A's on the longerons interfere with
> fitting the canopy frame. I'm trying to determine whether I'm supposed
>
> to go ahead with riveting these 2 small pieces so I can fit the canopy,
> & not interfere with anything else in the process.
>
> Thanks,
>
> Charlie
>
>
>
Other Matronics Email List Services
These Email List Services are sponsored solely by Matronics and through the generous Contributions of its members.
-- Please support this service by making your Contribution today! --
|