I've reached the point of trimming the counterbalance weights for the
elevators.
Without having a chance to balance the elevators first, trimming these
weights make me a bit nervous. It seems like there is the possibility
that Vans estimates could allow for too much removal.
If I trim the weights as the plans describe, is there still more than
enough lead remaining to balance the control surfaces later?
If so, what's the process for removing the lead from a counterbalance
weight that's already in place? A drill?
Thanks,
Phil
Message 2
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: Elevator Counterbalance |
Yup....drill out the amount needed to bring it into balance. Adding it in i
s a little tougher, but easily done casting some lead sheet to go under the
attach bolts.
Rick S.
40185
do not archive
----- Original Message -----
From: "Phil Perry" <Phil.Perry@netapp.com>
Sent: Friday, September 5, 2008 7:50:14 PM (GMT-0800) America/Los_Angeles
Subject: RV10-List: Elevator Counterbalance
I've reached the point of trimming the counterbalance weights for the eleva
tors.
Without having a chance to balance the elevators=C2-first, trimming these
weights make me a bit nervous.=C2- It seems like there is the possibilit
y that Vans estimates could allow for too much removal.
If I trim the weights=C2-as the plans describe, is there still more than
enough lead remaining to balance the control surfaces later?
If so, what's the process for removing the lead from a counterbalance weigh
t that's already in place?=C2- A=C2-drill?
Thanks,
Phil
====
=======================
==
Message 3
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Elevator Counterbalance |
Thanks Rick..
Even though the plans don't call for it, I'm assuming I should go ahead
and torque them down now.
Thanks,
Phil
________________________________
From: Rick Sked [mailto:ricksked@embarqmail.com]
Sent: Friday, September 05, 2008 10:04 PM
Subject: Re: RV10-List: Elevator Counterbalance
Yup....drill out the amount needed to bring it into balance. Adding it
in is a little tougher, but easily done casting some lead sheet to go
under the attach bolts.
Rick S.
40185
do not archive
----- Original Message -----
From: "Phil Perry" <Phil.Perry@netapp.com>
Sent: Friday, September 5, 2008 7:50:14 PM (GMT-0800)
America/Los_Angeles
Subject: RV10-List: Elevator Counterbalance
I've reached the point of trimming the counterbalance weights for the
elevators.
Without having a chance to balance the elevators first, trimming these
weights make me a bit nervous. It seems like there is the possibility
that Vans estimates could allow for too much removal.
If I trim the weights as the plans describe, is there still more than
enough lead remaining to balance the control surfaces later?
If so, what's the process for removing the lead from a counterbalance
weight that's already in place? A drill?
Thanks,
Phil
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=
3D=3D=3D=3D=3D=3D=3D=3D=3D
3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D=3D
Other Matronics Email List Services
These Email List Services are sponsored solely by Matronics and through the generous Contributions of its members.
-- Please support this service by making your Contribution today! --
|