---------------------------------------------------------- RV7-List Digest Archive --- Total Messages Posted Mon 04/19/04: 1 ---------------------------------------------------------- Today's Message Index: ---------------------- 1. 09:21 AM - Re: Riveting F 704-RV-7 (Hopperdhh@AOL.com) ________________________________ Message 1 _____________________________________ Time: 09:21:05 AM PST US From: Hopperdhh@AOL.com Subject: Re: RV7-List: Riveting F 704-RV-7 --> RV7-List message posted by: Hopperdhh@aol.com Cliff, I think you must have missed something! Yes, rivet on the F704 C & D pieces to the spar before the skin. I think they should have been put on during construction of the F704 bulkhead. While you are at it, now would be the easiest time to install the two fuel lines that go from the valve to the (enlarged) holes in the skin. It is very hard to get a good job after the skins are on. Dan Hopper (Indiana, USA) RV-7A (almost done) In a message dated 4/16/04 1:30:24 AM US Eastern Standard Time, exodus@gds.co.za writes: > > --> RV7-List message posted by: "Exodus" > > Hi all > I am getting ready to rivet on the forward fuselage skins (RV-7) but have > not yet riveted the F 704C and F 704 D centre section side plates to the F 704 > F and E centre section fore and aft bulkheads. I dont remember seeing these > instructions in the manual. Do I have to wait till later or did I miss > something. > Regards > Cliff Lotter > South Africa > Do not archive > >