RV9-List Digest Archive

Tue 11/09/04


Total Messages Posted: 3



Today's Message Index:
----------------------
 
     1. 07:23 AM - Horizontal Stabilizer Ribs (Chenoweth)
     2. 07:54 AM - Re: Horizontal Stabilizer Ribs (Michael T. Ice)
     3. 08:27 AM - Re: Horizontal Stabilizer Ribs (Hebert, Richard)
 
 
 


Message 1


  • INDEX
  • Back to Main INDEX
  • NEXT
  • Skip to NEXT Message
  • LIST
  • Reply to LIST Regarding this Message
  • SENDER
  • Reply to SENDER Regarding this Message
    Time: 07:23:09 AM PST US
    From: "Chenoweth" <chenoweth@gwi.net>
    Subject: Horizontal Stabilizer Ribs
    --> RV9-List message posted by: "Chenoweth" <chenoweth@gwi.net> I just started the RV9 empennage kit and ran into a snag fitting the 904's to the front spar. While the three 1/8 pre-punched holes in the front flange of the ribs match the three corresponding ones in the spar the top and bottom 3/32 holes in the rib flange really dont' want to match their partners in the spar flange. I can get a cleco in them with a lot of bending and pushing but I'm concerned that when it's time to match drill the skin thru the spar and into the rib I'll end up with, at best, an oversized hole in the rib and, at worst, two holes in the front of each rib. Clearly there is something not bent correctly but I can't figure out what. This is my first metal airplane (currently I'm a Kitfox builder/flier) so I have virtually no background to draw on. Bill Chenoweth Albion, Maine


    Message 2


  • INDEX
  • Back to Main INDEX
  • PREVIOUS
  • Skip to PREVIOUS Message
  • NEXT
  • Skip to NEXT Message
  • LIST
  • Reply to LIST Regarding this Message
  • SENDER
  • Reply to SENDER Regarding this Message
    Time: 07:54:54 AM PST US
    From: "Michael T. Ice" <aurbo@ak.net>
    Subject: Re: Horizontal Stabilizer Ribs
    --> RV9-List message posted by: "Michael T. Ice" <aurbo@ak.net> Bill, I just finished the HS about 3 weeks ago. You will run into all sorts of little problems like this. Pushing and bending is part of the process, with limitations of course. Did you "Flute" the ribs? Mike Ice Anchorage, Alaska RV-9 standard build, elevators ----- Original Message ----- From: "Chenoweth" <chenoweth@gwi.net> Subject: RV9-List: Horizontal Stabilizer Ribs > --> RV9-List message posted by: "Chenoweth" <chenoweth@gwi.net> > > I just started the RV9 empennage kit and ran into a snag fitting the 904's to the front spar. > > While the three 1/8 pre-punched holes in the front flange of the ribs match the three corresponding ones in the spar the top and bottom 3/32 holes in the rib flange really dont' want to match their partners in the spar flange. > > I can get a cleco in them with a lot of bending and pushing but I'm concerned that when it's time to match drill the skin thru the spar and into the rib I'll end up with, at best, an oversized hole in the rib and, at worst, two holes in the front of each rib. > > Clearly there is something not bent correctly but I can't figure out what. This is my first metal airplane (currently I'm a Kitfox builder/flier) so I have virtually no background to draw on. > > Bill Chenoweth > Albion, Maine > >


    Message 3


  • INDEX
  • Back to Main INDEX
  • PREVIOUS
  • Skip to PREVIOUS Message
  • NEXT
  • Skip to NEXT Message
  • LIST
  • Reply to LIST Regarding this Message
  • SENDER
  • Reply to SENDER Regarding this Message
    Time: 08:27:14 AM PST US
    From: "Hebert, Richard" <Richard.Hebert@t-mobile.com>
    Subject: Horizontal Stabilizer Ribs
    --> RV9-List message posted by: "Hebert, Richard" <Richard.Hebert@T-Mobile.com> Hi Bill, We built the RV-9A empenage at the Alexander Technical Center in Griffin, GA and didn't have any problems getting the 904s to line up. You will have to drill the pre-punched wholes out with the appropriate drill bits and this should help to get the fit right. If the alignment is off significantly, you may need Van's to resend you replacement pieces. I've attached pictures of the front spar before and after riveting. Everything worked out as planned. Hope this helps....and happy building... Richard Hebert/Ray Abadie Atlanta GA RV-9A -----Original Message----- From: owner-rv9-list-server@matronics.com [mailto:owner-rv9-list-server@matronics.com]On Behalf Of Chenoweth Subject: RV9-List: Horizontal Stabilizer Ribs --> RV9-List message posted by: "Chenoweth" <chenoweth@gwi.net> I just started the RV9 empennage kit and ran into a snag fitting the 904's to the front spar. While the three 1/8 pre-punched holes in the front flange of the ribs match the three corresponding ones in the spar the top and bottom 3/32 holes in the rib flange really dont' want to match their partners in the spar flange. I can get a cleco in them with a lot of bending and pushing but I'm concerned that when it's time to match drill the skin thru the spar and into the rib I'll end up with, at best, an oversized hole in the rib and, at worst, two holes in the front of each rib. Clearly there is something not bent correctly but I can't figure out what. This is my first metal airplane (currently I'm a Kitfox builder/flier) so I have virtually no background to draw on. Bill Chenoweth Albion, Maine




    Other Matronics Email List Services

  • Post A New Message
  •   rv9-list@matronics.com
  • UN/SUBSCRIBE
  •   http://www.matronics.com/subscription
  • List FAQ
  •   http://www.matronics.com/FAQ/RV9-List.htm
  • Full Archive Search Engine
  •   http://www.matronics.com/search
  • 7-Day List Browse
  •   http://www.matronics.com/browse/rv9-list
  • Browse RV9-List Digests
  •   http://www.matronics.com/digest/rv9-list
  • Browse Other Lists
  •   http://www.matronics.com/browse
  • Live Online Chat!
  •   http://www.matronics.com/chat
  • Archive Downloading
  •   http://www.matronics.com/archives
  • Photo Share
  •   http://www.matronics.com/photoshare
  • Other Email Lists
  •   http://www.matronics.com/emaillists
  • Contributions
  •   http://www.matronics.com/contributions

    These Email List Services are sponsored solely by Matronics and through the generous Contributions of its members.

    -- Please support this service by making your Contribution today! --