Today's Message Index:
----------------------
1. 09:37 AM - Re: Upgrade Drawing Pkg (dfmoeller)
2. 09:56 AM - Re: Upgrade Drawing Pkg (DaveG601XL)
3. 10:24 AM - Solid Rivets (Afterfxllc@aol.com)
4. 01:12 PM - Re: Re: Upgrade Drawing Pkg. (Gary Gower)
Message 1
INDEX | Back to Main INDEX |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: Upgrade Drawing Pkg |
dfmoeller wrote:
> Looks like a new rev is online at Zenith. See http://www.zenithair.com/news/ntsb-astm-4-09a.html
>
> Doug
After digesting the new package last night, I'm still very confused about exactly
which set of holes, if any, the rivet lines that mount the middle spar to the
floor will be reused.
Anybody got a handle on this?
Doug
Read this topic online here:
http://forums.matronics.com/viewtopic.php?p=274776#274776
Message 2
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: Upgrade Drawing Pkg |
>From what I see, they are all being re-used. The center spar forward portion
is being moved further forward by 1/8". If you drilled the holes for the old
front spar web, 6W4-1, and spar uprights 6B13-1, right down the middle, you should
have enough room left for the new parts to use the same holes. If the holes
were drilled right next to the bend radius then I think you have a problem
and need to call Zenith.
--------
David Gallagher
601 XL/Jabiru 3300
First flight 7/24/08
116.5 hours and holding
Read this topic online here:
http://forums.matronics.com/viewtopic.php?p=274777#274777
Message 3
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
I posted this on Zenith Aero but it was removed for some reason so I will
repost it here.
On the second wing I will have a helper hold the camera so you can see more
of the work.
And after doing a lot of the mod already I think it will take 200 hrs also.
Rivet removal _http://www.youtube.com/watch?v=gr24Nvs7fd0_
(http://www.youtube.com/watch?v=gr24Nvs7fd0)
Rivet sizing _http://www.youtube.com/watch?v=9hvMbI_qkAA_
(http://www.youtube.com/watch?v=9hvMbI_qkAA)
Rivet Bucking _http://www.youtube.com/watch?v=GRMgV06sZ24_
(http://www.youtube.com/watch?v=GRMgV06sZ24)
Jeff
I will also go thru all the video's I have made and group them into section
so it will be easier to find what you are looking for.
Message 4
INDEX | Back to Main INDEX |
PREVIOUS | Skip to PREVIOUS Message |
NEXT | Skip to NEXT Message |
LIST | Reply to LIST Regarding this Message |
SENDER | Reply to SENDER Regarding this Message |
|
Subject: | Re: Upgrade Drawing Pkg. |
I-am sure-that Jon from Homebuilt Help will come out with a video...-
They are great help.
-
Probably will be a good resource for the (as close as possible to)-plans
built- and kit airplanes...- Sure could-be for the Quickbuilts.
-
Well, just thought of this and hit the keyboard...-
-
Saludos
Gary Gower
--- On Wed, 11/25/09, dfmoeller <dfmoeller@austin.rr.com> wrote:
From: dfmoeller <dfmoeller@austin.rr.com>
Subject: Zenith601-List: Re: Upgrade Drawing Pkg
dfmoeller wrote:
> Looks like a new rev is online at Zenith.- See http://www.zenithair.com
/news/ntsb-astm-4-09a.html
>
> Doug
After digesting the new package last night, I'm still very confused about e
xactly which set of holes, if any, the rivet lines that mount the middle sp
ar to the floor will be reused.
Anybody got a handle on this?
Doug
Read this topic online here:
http://forums.matronics.com/viewtopic.php?p=274776#274776
le, List Admin.
=0A=0A=0A
Other Matronics Email List Services
These Email List Services are sponsored solely by Matronics and through the generous Contributions of its members.
-- Please support this service by making your Contribution today! --
|