Photo Index (RV2B)

Drilling ribs to L spar (32KB)

Spars in double-wing jig (40KB)

Double-wing jig -- tip end view (34KB)

Ribs drilled to L main spar (41KB)

Attaching ribs to rear spar (34KB)

Levelling R main spar (22KB)

Bottom outboard skin attached to R skeleton (22KB)

Attaching bellcrank gussets to lower skin/skeleton (19KB)

Bottom outboard skin drilled and clecoed to R skeleton (30KB)

Bottom outboard skin part-drilled to L skeleton (20KB)

Preparing to prime wing main skins (16KB)

Forming flange strips (taken by David) (21KB)

R LE strapped down for drilling, with David (26KB)

LE cradle being built. 4/2/98 (17KB)

LE complete, showing wiring conduit (12KB)

Rivetting LE (21KB)

Home Page
Bunny's Guide